In Nogent-sur-Seine, on the biomass boiler site of the Saica paper mill entrusted to Eiffage Construction, our teams completed the walls of a wood pellet storage silo (45 to 65 cm thick) in record time using the slipform technique.
This structure, nearly 15 meters high and 21 meters in diameter, was built in just 5 days.
A swift operation carried out 24/7 between July 29 and August 2.
Congratulations to our teams involved in this project!
Credit: Auteurs de Vues
Client: Saica Group
Project Manager: Egis
Structural Work: Eiffage Construction