The steel framework was manufactured by Eiffage Métal in eastern France, at its factory in Lauterbourg (67). A meticulous manufacturing process for one of the key elements of the project, which the ETPO Group construction teams were able to observe during a visit a few weeks ago. This 1,000-ton framework, with a total length of 205 meters, will adorn and support the concrete bridge.
The visit provided a better understanding of the various stages of the framework's production in the factory and allowed for on-site quality control before its delivery.
Next step: the first launching phase at the end of this year.
Client: Brest Métropole
Delegated client: BMa - Brest Métropole Aménagement
Project management: MobiBrest, SYSTRA (lead contractor), SCE Aménagement & Environnement, B3i, FERRAND-SIGAL Architectes & Associés, super8, LA/BA architects
Construction consortium: ETPO, a subsidiary of the ETPO Group - Eiffage Métal
Earthworks: Spie batignolles Valérian
© Tydeo - Franck Betermin